Current Road Pavement Improvements

Design Efforts

In February 2022, the City of Turlock approved a professional services agreement with a consultant for the design of the pavement rehabilitation of 15 streets within the City of Turlock. The design of these 15 streets will also include traffic striping, coordination with utility companies, and handicap access upgrades, specifically, the construction of accessible curb ramps when adjacent to a prepared surface for pedestrian use.

The design will be broken up into three (3) packages, Package 1 consisting of 13 Streets, and Packages 2 and 3 including 1 street each. The design of Package 2 (Wayside Drive) is the first scheduled and is planned to begin construction in August 2022.

STREET NAMEPROJECT LIMITSDISTRICT
20th Century Blvd.East of Golden State Blvd. to Geer Rd. 4
Carrigan St.N. Johnson Rd. to N. Quincy Rd.1
Corrello St.Sierra Vista Dr. to Marlee Dr.1
Delbon Ave.N. Olive Ave. to Colorado Ave.1
East Ave.Golden State Blvd. to Daubenberger Rd. (except for the County island)1
Flower St.N. Soderquist Rd. to N. 1St St.2
Fosberg Rd.E. Monte Vista Ave. to E. Christoffersen Pkwy.3
Julian St.N. Soderquist Rd. to N. 1St St.2
Locust St.Vermont Ave. to W. Main St.2
Mira Flores Dr.El Paseo St. to Murphy Dr. 1
N. Orange St.W. Main St. to Flower St.2
Old Vineyard Rd.E. Marshall St. to E. Canal Dr.1
Park St.N. Soderquist Rd. to N. 1St St.2
Spruce St.South Ave. to High St.2
Wayside Dr.Geer Rd. to Pioneer Ave. (portion abuts County island)1




Schedule shown below is tentative and subject to change as the design process progresses.



For questions about the Roads Program, please contact:

Engineering Division
156 S. Broadway, Ste. 150
Turlock, CA 95380
(209) 668-5520
engineering@turlock.ca.us
Monday - Friday, 9AM - 4PM






Icons made by Freepik from www.flaticon.com is licensed by CC 3.0 BY



Top